Lots of progress in the guest house today: our kitchen cabinets we’re installed as well as the toilet and most of the electrical fixtures. Our appliances were also delivered. We now need counter tops, finishing the plumbing and the shower tiles, some final painting, and connecting the house to the water, power, and septic system. We can see the light at the end of the guest house tunnel!
They also did some much needed work on the driveway, including building stairs along the steepest part so we can safely walk down without sliding. Yes, it is that steep!