Construction Progress Report

On March 15, 2009, in Panama, Tropical House, by sduford

The windows and doors are installed in the guest house and the electrical wires have been run. The septic system is also almost completed. They have built the little roof structure over the entrance. This will eventually be covered with my product, Palmex.

Entrance

They have also built the pool stairs and poured the concrete ring that will hold the roof of the bohio (round gazebo).

Pool

While things are progressing, I doubt that we will be able to move into the guest house by the end of March as we had hoped for.